
The Detroit People Mover rides a 2.9-mile loop of track encircling downtown Detroit. Originally designed to accommodate 15 million riders a year, it sees traffic of around 2 million. In 2008, the People Mover changed directions from counter-clockwise to clockwise apparently shaving 26 seconds from travel. It is rumoured that the US Dept of Transportation will construct a light rail project from Downtown Detroit, linking with people mover, to 8 mile over the next decade.

The Detroit People Mover rides a 2.9-mile loop of track encircling downtown Detroit. Originally designed to accommodate 15 million riders a year, it sees traffic of around 2 million. In 2008, the People Mover changed directions from counter-clockwise to clockwise apparently shaving 26 seconds from travel. It is rumoured that the US Dept of Transportation will construct a light rail project from Downtown Detroit, linking with people mover, to 8 mile over the next decade.

The Detroit People Mover rides a 2.9-mile loop of track encircling downtown Detroit. Originally designed to accommodate 15 million riders a year, it sees traffic of around 2 million. In 2008, the People Mover changed directions from counter-clockwise to clockwise apparently shaving 26 seconds from travel. It is rumoured that the US Dept of Transportation will construct a light rail project from Downtown Detroit, linking with people mover, to 8 mile over the next decade.